Posted on:
Jan 08, 2008
05:14PM

Permanent Link

Larchmont Upgrades

  • City Planning Department will hold workshops and hearings this Spring and Summer on proposed new zoning restrictions for Larchmont Village. Restrictions would include reducing the height limit for new construction to 35 feet high; limiting the width of individual storefronts to 50 feet wide and maintaining a 5-foot setback and other restrictions already in place under the Q Conditions.


 



 
Posted on:
Jan 08, 2008
05:11PM

Permanent Link

CRA project -- Wilshire YMCA

  • Helping them with final fundraising
  • Applied for multi-million dollar grant from CRA


 



 
Posted on:
Jan 08, 2008
05:07PM

Permanent Link

Los Feliz Elementary School

  • Will work with DOT on No U-Turn sign mid-block
  • BOE re: demo/filling in of Hollywood Bl. tunnel, speed humps, other issues


 



 
Posted on:
Jan 08, 2008
05:04PM

Permanent Link

Lake Hollywood landslide repairs


 



 
Posted on:
Jan 08, 2008
05:01PM

Permanent Link

Tahoe Dr. CMP failure repair

  • DPW/BOE/Stormwater Group is lead agency
  • Pipe was scoped and determined to be an emergency
  • Contractor was selected and should begin work shortly
  • CCTV conducted by Sanitation from upstream MH to the sinkhole indicates that the RCP is in good shape, and the deteriorated 48" CMP will be rehabilitated by sliplining a 26" HDPE joinless pipe which is hydraulically capable to handle the flow of 50-yr storm


 



 
Posted on:
Jan 08, 2008
04:52PM

Permanent Link

ACS Relay for Life in Silver Lake


 



 

Universal land development

  • Citizens oversight committee formed under Toluca Lake CC auspices