Tahoe Dr. CMP failure repair
- DPW/BOE/Stormwater Group is lead agency
- Pipe was scoped and determined to be an emergency
- Contractor was selected and should begin work shortly
- CCTV conducted by Sanitation from upstream MH to the sinkhole indicates that the RCP is in good shape, and the deteriorated 48" CMP will be rehabilitated by sliplining a 26" HDPE joinless pipe which is hydraulically capable to handle the flow of 50-yr storm